Rayen Cura Parking

The project entailed the construction of new parking spaces for the administrative staff of Rayen Cura. The following tasks were performed: Earthworks Asphalt pavement of 5cm thickness Perimeter enclosure and installation of electric gate Construction of security cabin Construction of lightweight metal frame for parking roofing Road painting

Reconditioning of Public Transport Mainline Road

This project was part of the works needed for the reconditioning of the Metrobus Mainline Road System. Among the main benefits it had, the following are highlighted: unification of flouting bus stop every 400 meters; greater accessibility for users and fluidity for police vehicles and emergency services. The bus stops have LED lighting, safety rail, […]

Paso de los Andes Avenue – 1st Stage

This project entailed the comprehensive remodeling and construction of Paso de los Andes Avenue between Frias Canal and Pellegrini Street with an approximate length of 650m. The following tasks were performed: Demolitions of sidewalk gutters, curbs, shoulders, sidewalks, subfloors, corner slabs, sewers, vehicular and pedestrian bridges. Road infrastructure. Construction of curbs, shoulders, gutters, culverts, bridges, […]

Paso de los Andes – 2nd Stage

This project entailed the comprehensive remodeling and construction of Paso de los Andes Avenue between Pellegrini Street and Maure Canal with an approximate length of 1500m. The following tasks were performed: Demolitions of sidewalk gutters, curbs, shoulders, sidewalks, subfloors, corner slabs, sewers, vehicular and pedestrian bridges. Road infrastructure. Construction of curbs, shoulders, gutters, culverts, bridges, […]

Pedro Molina Promenade

The comprehensive renovation of Pedro Molina Promenade located in the Civic Center of Mendoza City. This project takes part in the Public Works Planning of the City Council. The purpose of this project was to optimize the entire area by turning this street into a walkway that efficiently connects San Martín and Belgrano Avenues, motivates […]

Reconditioning of State Highway 82 – Section I

The reconditioning of the State Highway 82 – Section I is part of a series of comprehensive improvements planned by the Provincial Road Department to be carried out over the entire Highway. The total length of the works is about 1200m with lanes of 7.0m of width. The following tasks were performed: Demolitions Earthworks Asphalt […]

O’Higgins Park

The project entailed the construction of a new Gabriela Mistral Theater, projected as a core infrastructure to foster cultural patrimony. Leisure area for older adults with a bocce court, shuffleboard, and chess court. The construction of a skatepark, parkour and bmx bowls. Children’s leisure centers and an interactive fountain. Incorporation of an area for itinerant […]

Arístides Promenade

The City Council included, within the 2017 Public Works Planning, the performance of improvements/renovation works that totally refurbished and optimized Arístides Villanueva Avenue in its entirety, starting at Belgrano Street, up to Boulogne Sur Mer Avenue. The project entailed the complete change of the vehicular bearing layer was included, the renovation of gutters, vehicular and pedestrian […]