Pre-School Kindergarten N°0-133 Manantiales

This project entailed the construction of a 450m² kindergarten building in Tunuyán County, Province of Mendoza. The following tasks were performed: Excavation for foundation Reinforced concrete structure Lightweight roofing Masonry enclosure Sanitary, electrical and gas installation Subfloor construction Under coat and finish coat plastering Ceramic floor installation Gypsum-board suspended ceiling Aluminum and wood carpentry material […]

Buenos Aires Port Perimeter

As it was necessary to provide better safety conditions within the Port State Jurisdiction premises, the General Port Administration – State Enterprise decided to carry out the construction and readaptation of the Buenos Aires port perimeters and accesses. The following tasks were performed: In the loading dock, located in Puerto Sur where ​​the Boca Riachuelo […]

Renovation of MMAMM Plaza Independencia

The city council included, within the Public Works Planning, works of improvements for the renovation of the PLAZA INDEPENDENCIA CULTURAL COMPLEX which includes the following buildings: the Municipal Museum of Modern Art of Mendoza City – (MMAMM), the Ricardo Tudela City Library and the Julio Quintanilla City Theater. The purpose of these improvements was a […]

Areneras Promenade

The project entailed carrying out a Coastal Promenade on Rafael Obligado Avenue on the Western edge of Harbor F that arises as a fundamental pedestrian link between the future elevated park over the layout of the Arturo IIlia highway and the coastal bordering area surrounding Costanera Norte. This area is projected as the «Distrito Joven», […]

Reconditioning of Circumjacent Areas of the City Court Building

This project entailed the intervention of specific urban elements that will shape the surrounding open spaces of the cluster of City Court buildings in the future. Works on the public space were carried out in terms of addition and rearrangement of green areas, street lighting and road and pedestrian crossing. The works were carried out […]

Evangelist Church

An important Architectural and Civil Works Project for a Temple featuring a 5,200m2 building and associated facilities. The works entailed the construction of underground parking spaces with underpinning walls along the dividing perimeter. The project has the following facilities: underground parking spaces, entrance hall, coffee bar, toilets, main auditorium, administration offices, engine room and warehouses. […]

Reconditioning of Retiro Terminal surrounding area CABA – Stage lll

The designed intervention for civil works corresponded to the Third Stage of Architectural Enhancement and Urban Renovation of the Retiro surrounding area. By profiting from a reduced vehicular traffic rate, a project was proposed for the leveling of Arroyo Street from Esmeralda to Carlos Pellegrini Street, and of Suipacha Street from Del Libertador Avenue to Juncal […]

Flores Irrigation Canal – Stage III

The water intake of the Flores Canal is on the right bank of the Matriz Canal of Mendoza River, which receives water from the Cipolletti Dam. Throughout its extension, the channeling has gentle gradients and serious problems of infiltration and erosion, consequently it was necessary to complete a third stage of the project. The lined area […]

NATANIA Neighborhood Housing Development – Stage VIII

This housing project entailed the construction of 19 units of approximately 70m2 each. The following tasks were performed: Excavation for foundations Reinforced concrete structure Lightweight roofing Masonry enclosure Sanitary, electrical and gas installations Subfloor construction Under coat and finish coat plastering Ceramic floor installation Gypsum-board suspended ceiling Provision and placement of aluminum and wood carpentry […]

Repaving of Alem Street

This project was aimed at providing the street structure with a rigid bearing layer suitable for the present-day traffic conditions, since the previous one was deteriorated as a result of not having been designed for the strength applied to it. The following tasks were performed: Demolitions and excavations: the existing concrete roadway was demolished, and […]